Re-Structuring of IT Cadre in Zonal Railways/Production Units :RBA No. 22/2019

Re-Structuring of IT Cadre in Zonal Railways/Production Units :RBA No. 22/2019

GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
RAILWAY BOARD

RBA No. 22/2019

No. 2016/AC-II(CC)/37/9

28-3-2019

General Managers,
All Zonal Railways and Production Units (including RDSO)

Sub :– Re-Structuring of IT Cadre in Zonal Railways/Production Units.

Ref:- Board’s letter of even No. dated 18.04.2017 (RBA 45/2017).

Further to the instructions issued vide Board’s letter ibid, the matter regarding restructuring of Senior Engineer (IT) and Junior Engineer (IT)’s post of IT Cadre in Zonal Railways/Production Units has again been reviewed in the Ministry of Railways and it has now been decided with the approval of competent authority, that the cadre restructuring of the post of Senior Engineer (IT) and Junior Engineer (IT) of IT Cadre, earlier approved on the basis of operated strength as on 1.4.2017 in the ratio of 67:33 respectively, shall now be done on the basis of Sanctioned Strength of Senior Engineer (IT) and Junior Engineer (IT) w.e.f. 1.4.2017. The entire up-gradation has to be revenue neutral. Accordingly, the revised sanctioned strength of Senior Engineer (IT) and Junior Engineer (IT) of IT Cadre in Zonal Railways/Production Units as on 1.4.2017 after restructuring duly taking into account the surrender of JE/IT posts shall be as under:-

S.No Zonal Railway/Production Unit Revised Sanctioned Strength after restructuring w.e.f 1.4.2017
HAT SE/IT Total
1 Central Railway 23 50 73
2 Eastern Railway 49 51 100
3 Northern Railway 44 50 94
4 North Eastern Railway 20 37 57
5 North East Frontier Railway 8 90 98
6 Southern Railway 20 37 57
7 South Central Railway 13 51 64
8 South Eastern Railway 27 65 92
9 Western Railway 10 33 43
10 North Western Railway 10 18 28
11 West Central Railway 0 22 22
12 East Coast Railway 3 10 14
13 East Central Railway 1 16 17
14 South Western Railway 8 4 12
15 North Central Railway 16 31 47
16 South East Central Railway 5 37 42
17 Diesel Modernisation Works, Patiala 1 8 9
18 Rail Wheel Factory, Bengaluru 0 14 14
19 Chittaranjan Locomotive Works 12 31 43
20 Diesel Locomotive, Varanasi 1 31 32
21 Integral Coach Factory 7 40 47
22 Central Organisation for Railway Electrification 0 1 1
23 Metro Railway, Kolkata 0 8 8
24 RDSO, LKO 0 9 9
25 Rail Coach Factory (KXH) 0 45 45
Total 278 789 1067

3. Surrender of Post in JE/IT will be effected before implementing above mentioned cadre restructure orders and the resultant imbalance/variation in the cadre due to surrender of posts of JE/IT shall be reviewed at the time of next annual review of the cadre after implementation of cadre restructuring.

4. Zonal Railways/Production Units may update the book of sanction as per the above sanctioned post w.e.f 1.4.2017..

5. All the other terms and condition mentioned in Board’s letter ibid remain unchanged.

(Gaisingam Kabui)
Director Finance/CCA,
Railway Board

download id=”110723″ template=”dlm-buttons-button”]

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Discover more from Govtempdiary

Subscribe now to keep reading and get access to the full archive.

Continue reading